ITER
Formation | 24 October 2007 |
---|---|
Headquarters | Saint-Paul-lès-Durance, France |
Membership | China European Union India |
Director-General | Pietro Barabaschi |
Website | www |
Device type | Tokamak |
---|---|
Location | Saint-Paul-lès-Durance, France |
Technical specifications | |
Major radius | 6.2 m (20 ft) |
Plasma volume | 840 m3 |
Magnetic field | 11.8 T (peak toroidal field on coil) 5.3 T (toroidal field on axis) 6 T (peak poloidal field on coil) |
Heating power | 320 MW (electrical input) 50 MW (thermal absorbed) |
Fusion power | 0 MW (electrical generation) 500 MW (thermal from fusion) |
Discharge duration | up to 1000 s |
History | |
Date(s) of construction | 2013–2034 |
ITER (initially the International Thermonuclear Experimental Reactor, iter meaning "the way" or "the path" in Latin[2][3][4]) is an international nuclear fusion research and engineering megaproject aimed at creating energy through a fusion process similar to that of the Sun. It is being built next to the Cadarache facility in southern France.[5][6] Upon completion of construction of the main reactor and first plasma, planned for 2033–2034,[7][8] ITER will be the largest of more than 100 fusion reactors built since the 1950s, with six times the plasma volume of JT-60SA in Japan, the largest tokamak operating today.[9][10][11]
The long-term goal of fusion research is to generate electricity. ITER's stated purpose is scientific research, and technological demonstration of a large fusion reactor, without electricity generation.[12][9] ITER's goals are to achieve enough fusion to produce 10 times as much thermal output power as thermal power absorbed by the plasma for short time periods; to demonstrate and test technologies that would be needed to operate a fusion power plant including cryogenics, heating, control and diagnostics systems, and remote maintenance; to achieve and learn from a burning plasma; to test tritium breeding; and to demonstrate the safety of a fusion plant.[10][6]
ITER's thermonuclear fusion reactor will use over 300 MW of electrical power to cause the plasma to absorb 50 MW of thermal power, creating 500 MW of heat from fusion for periods of 400 to 600 seconds.[13] This would mean a ten-fold gain of plasma heating power (Q), as measured by heating input to thermal output, or Q ≥ 10.[14] As of 2022[update], the record for energy production using nuclear fusion is held by the National Ignition Facility reactor, which achieved a Q of 1.5 in December 2022.[15] Beyond just heating the plasma, the total electricity consumed by the reactor and facilities will range from 110 MW up to 620 MW peak for 30-second periods during plasma operation.[16] As a research reactor, the heat energy generated will not be converted to electricity, but simply vented.[6][17][18]
ITER is funded and run by seven member parties: China, the European Union, India, Japan, Russia, South Korea and the United States. In the immediate aftermath of Brexit, the United Kingdom continued to participate in ITER through the EU's Fusion for Energy (F4E) program;[19] however, in September 2023, the UK decided to discontinue its participation in ITER via F4E,[20] and by March 2024 had rejected an invitation to join ITER directly, deciding instead to pursue its own independent fusion research program.[21] Switzerland participated through Euratom and F4E, but the EU effectively suspended Switzerland's participation in response to the May 2021 collapse in talks on an EU-Swiss framework agreement;[22] as of 2024[update], Switzerland is considered a non-participant pending resolution of its dispute with the EU.[23] The project also has cooperation agreements with Australia, Canada, Kazakhstan and Thailand.[24]
Construction of the ITER complex in France started in 2013,[25] and assembly of the tokamak began in 2020.[26] The initial budget was close to €6 billion, but the total price of construction and operations is projected to be from €18 to €22 billion;[27][28] other estimates place the total cost between $45 billion and $65 billion, though these figures are disputed by ITER.[29][30] Regardless of the final cost, ITER has already been described as the most expensive science experiment of all time,[31] the most complicated engineering project in human history,[32] and one of the most ambitious human collaborations since the development of the International Space Station (€100 billion or $150 billion budget) and the Large Hadron Collider (€7.5 billion budget).[note 1][33][34]
ITER's planned successor, the EUROfusion-led DEMO, is expected to be one of the first fusion reactors to produce electricity in an experimental environment.[35]
Background
[edit]Fusion aims to replicate the process that takes place in stars where the intense heat at the core fuses together nuclei and produces large amounts of energy in the form of heat and light. Harnessing fusion power in terrestrial conditions would provide sufficient energy to satisfy mounting demand, and to do so in a sustainable manner that has a relatively small impact on the environment. One gram of deuterium-tritium fuel mixture in the process of nuclear fusion produces 90,000-kilowatt hours of energy, or the equivalent of 11 tonnes of coal.[36]
Nuclear fusion uses a different approach from traditional nuclear energy. Current nuclear power stations rely on nuclear fission with the nucleus of an atom being split to release energy. Nuclear fusion takes multiple nuclei and uses intense heat to fuse them together, a process that also releases energy.[37]
Nuclear fusion has many potential attractions. The fuel is relatively abundant or can be produced in a fusion reactor. After preliminary tests with deuterium, ITER will use a mix of deuterium-tritium for its fusion because of the combination's high energy potential[38] and because this fusion reaction is the easiest to run. The first isotope, deuterium, can be extracted from seawater, from which it is a nearly inexhaustible resource.[39] The second isotope, tritium, only occurs in trace amounts in nature and the estimated world's supply (mainly produced by the heavy-water CANDU fission reactors) is just 20 kilograms per year, insufficient for power plants.[40] ITER will be testing tritium breeding blanket technology that would allow a future fusion reactor to create its own tritium and thus be self-sufficient.[41][42] Furthermore, a fusion reactor would produce virtually no CO2 emissions or atmospheric pollutants, there would be no chance of a meltdown, and its radioactive waste products would mostly be very short-lived compared to those produced by conventional nuclear reactors (fission reactors).[43]
On 21 November 2006, the seven project partners formally agreed to fund the creation of a nuclear fusion reactor.[37] The program is anticipated to last for 30 years – 10 years for construction, and 20 years of operation. ITER was originally expected to cost approximately €5 billion.[44] However, delays, the rising price of raw materials, and changes to the initial design have seen the official budget estimate rise to between €18 billion and €20 billion.[45][46]
The reactor was expected to take 10 years to build, and ITER had planned to test its first plasma in 2020 and achieve full fusion by 2023. In 2024, ITER published a new schedule with deuterium-deuterium plasma operations starting in 2035.[7] Site preparation has begun near Cadarache center, France, and French President Emmanuel Macron launched the assembly phase of the project at a ceremony in 2020.[47] Under the revised schedule, work to achieve the first hydrogen plasma discharge was 70% complete in the middle of 2020 and considered to be on track.[48]
One of the ITER objectives is a Q-value ("fusion gain") of 10. Q = 1 is called "breakeven". The best result achieved in a tokamak is 0.67 in the JET tokamak.[49] The best result achieved for fusion in general is Q = 1.5, achieved in an inertial confinement fusion (ICF) experiment by the National Ignition Facility in late 2022.[15]
For commercial fusion power stations, engineering gain factor is important. Engineering gain factor is defined as the ratio of a plant electrical power output to electrical power input of all plant's internal systems (tokamak external heating systems, electromagnets, cryogenics plant, diagnostics and control systems, etc.).[50] Commercial fusion plants will be designed with engineering breakeven in mind (see DEMO). Some nuclear engineers consider a Q of 100 to be required for commercial fusion power stations to be viable.[51]
ITER will not produce electricity. Producing electricity from thermal sources is a well known process (used in many power stations) and ITER will not run with significant fusion power output continuously. Adding electricity production to ITER would raise the cost of the project and bring no value for experiments on the tokamak. The DEMO-class reactors that are planned to follow ITER are intended to demonstrate the net production of electricity.[52]
One of the primary ITER objectives is to achieve a state of "burning plasma". Burning plasma is the state of the plasma when more than 50% of the energy received for plasma heating is received from fusion reactions (not from external sources). No fusion reactors had created a burning plasma until the competing NIF fusion project reached the milestone on 8 August 2021 using inertial confinement.[53][54] At higher Q values, progressively bigger parts of plasma heating power will be produced by fusion reactions.[55] This reduces the power needed from external heating systems at high Q values. The bigger a tokamak is, the more fusion-reaction-produced energy is preserved for internal plasma heating (and the less external heating is required), which also improves its Q-value. This is how ITER plans for its tokamak reactor to scale.
Organisation history
[edit]The initial international cooperation for a nuclear fusion project that was the foundation of ITER began in 1978[56][57] with the International Tokamak Reactor, or INTOR, which had four partners: the Soviet Union, the European Atomic Energy Community, the United States, and Japan. However, the INTOR project stalled until Mikhail Gorbachev became general secretary of the Communist Party of the Soviet Union in March 1985. Gorbachev first revived interest in a collaborative fusion project in an October 1985 meeting with French President François Mitterrand, and then the idea was further developed in November 1985 at the Geneva Summit with Ronald Reagan.[58][59][60]
Preparations for the Gorbachev-Reagan summit showed that there were no tangible agreements in the works for the summit. However, the ITER project was gaining momentum in political circles due to the quiet work being done by two physicists, the American scientist Alvin Trivelpiece who served as Director of the Office of Energy Research in the 1980s and the Russian scientist Evgeny Velikhov who would become head of the Kurchatov Institute for nuclear research. The two scientists both supported a project to construct a demonstration fusion reactor. At the time, magnetic fusion research was ongoing in Japan, Europe, the Soviet Union and the US, but Trivelpiece and Velikhov believed that taking the next step in fusion research would be beyond the budget of any of the key nations and that collaboration would be useful internationally.[61]
Dr. Michael Robert, who is the director of International Programs of the Office of Fusion Energy at the US Department of Energy, explains that, 'In September 1985, I led a US science team to Moscow as part of our bilateral fusion activities. Velikhov proposed to me at lunch one day his idea of having the USSR and USA work together to proceed to a fusion reactor. My response was 'great idea', but from my position, I have no capability of pushing that idea upward to the President.' [62]
This push for cooperation on nuclear fusion is cited as a key moment of science diplomacy, but nonetheless a major bureaucratic fight erupted in the US government over the project. One argument against collaboration was that the Soviets would use it to steal US technology and expertise. A second was symbolic and involved American criticism of how the Soviet physicist Andrei Sakharov was being treated. Sakharov was an early proponent of the peaceful use of nuclear technology and along with Igor Tamm he developed the idea for the tokamak that is at the heart of nuclear fusion research.[63] However, Sakharov also supported broader civil liberties in the Soviet Union, and his activism earned him both the 1975 Nobel peace prize and internal exile in Russia, which he opposed by going on multiple hunger strikes.[64] The United States National Security Council convened a meeting under the direction of William Flynn Martin to discuss the nuclear fusion project that resulted in a consensus that the US should go forward with the project.
This led to nuclear fusion cooperation being discussed at the Geneva summit and release of a historic joint statement from Reagan and Gorbachev that emphasized, "the potential importance of the work aimed at utilizing controlled thermonuclear fusion for peaceful purposes and, in this connection, advocated the widest practicable development of international cooperation in obtaining this source of energy, which is essentially inexhaustible, for the benefit of all mankind."[65][66] For the fusion community, this statement was a breakthrough, and it was reinforced when Reagan evoked the possibilities of nuclear fusion in a Joint Session of Congress later in the month.[62]
As a result, collaboration on an international fusion experiment began to move forward. In October 1986 at the Reykjavik Summit, the so-called 'Quadripartite Initiative Committee' (Europe through the Euratom countries, Japan, USSR, and the US) was formed to oversee the development of the project.[67] The year after, in March 1987, the Quadripartite Initiative Committee met at the International Atomic Energy Agency (IAEA) headquarters in Vienna. This meeting marked the launch of the conceptual design studies for the experimental reactors as well as the start of negotiations for operational issues such as the legal foundations for the peaceful use of fusion technology, the organizational structure and staffing, and the eventual location for the project. This meeting in Vienna was also where the project was baptized the International Thermonuclear Experimental Reactor, though it was quickly called by its abbreviation alone and its Latin meaning of 'the way'.[62]
Conceptual and engineering design phases were carried out under the auspices of the IAEA.[68] The original technical objectives were established in 1992 and the original Engineering Design Activities (EDA) were completed in 1998.[69] An acceptable, detailed design was validated in July 2001 to complete the extended EDA period, and the validated design then went through a Design Review that began November 2006 and concluded in December 2007.[70][71] The design process was difficult with arguments over issues such as whether there should be circular cross sections for magnetic confinement or D-shaped cross sections. These issues were partly responsible for the United States temporarily exiting the project in 1998 before rejoining in 2003.[67]
At this same time, the group of ITER partners was expanding; China and South Korea joined the project in 2003 and India formally joined in 2005.[72][73][74]
There was a heated competition to host the ITER project with the candidates narrowed down to two possible sites: France and Japan. Russia, China, and the European Union supported the choice of Cadarache in France, while the United States, South Korea, and Japan support the choice of Rokkasho in Japan.[67] In June 2005, it was officially announced that ITER would be built in the South of France at the Cadarache site.[6] The negotiations that led to the decision ended in a compromise between the EU and Japan, in that Japan was promised 20% of the research staff on the French location of ITER, as well as the head of the administrative body of ITER. In addition, it was agreed that 8% of the ITER construction budget would go to partner facilities that would be built in Japan.[75]
On 21 November 2006, at a ceremony hosted by French President Jacques Chirac at the Élysée Palace in Paris, an international consortium signed a formal agreement to build the reactor.[76] Initial work to clear the site for construction began in Cadarache in March 2007 and, once this agreement was ratified by all partners, the ITER Organization was officially established on 24 October 2007.[77]
In 2016, Australia became the first non-member partner of the project. ITER signed a technical cooperation agreement with the Australian Nuclear Science and Technology Organisation (ANSTO), granting this country access to research results of ITER in exchange for the construction of selected parts of the ITER machine.[78][79] In 2017, Kazakhstan signed a cooperation agreement that laid the groundwork for technical collaboration between the National Nuclear Center of the Republic of Kazakhstan and ITER.[80] Most recently, after collaborating with ITER in the early stages of the project, Canada signed a cooperation agreement in 2020 with a focus on tritium and tritium-related equipment.[81]
The project began its assembly phase in July 2020, launched by French President Emmanuel Macron in the presence of other members of the ITER project.[82]
Directors-General
[edit]ITER is supervised by a governing body known as the ITER Council that is composed of representatives of the seven signatories to the ITER Agreement. The ITER Council is responsible for the overall direction of the organization and decides such issues as the budget.[83] The ITER Council also appoints the director-general of the project. There have been five directors-general so far:[84]
- 2005–2010: Kaname Ikeda
- 2010–2015: Osamu Motojima
- 2015–2022: Bernard Bigot
- 2022: Eisuke Tada (acting)
- 2022–present: Pietro Barabaschi[85]
Bernard Bigot was appointed to reform the management and governance of the ITER project in 2015.[86] In January 2019, the ITER Council voted unanimously to reappoint Bigot for a second five-year term.[87] Bigot died on May 14, 2022, and his deputy Eisuke Tada took over leadership of ITER during the search process for the new director.[88]
Objectives
[edit]ITER's stated mission is to demonstrate the feasibility of fusion power as a large-scale, carbon-free source of energy.[89] More specifically, the project has aims to:
- Momentarily produce a fusion plasma with thermal power ten times greater than the injected thermal power (a Q value of 10).
- Produce a steady-state plasma with a Q value greater than 5. (Q = 1 is scientific breakeven, as defined in fusion energy gain factor.)
- Maintain a fusion pulse for up to 8 minutes.
- Develop technologies and processes needed for a fusion power station — including superconducting magnets and remote handling (maintenance by robot).
- Verify tritium breeding concepts.
- Refine neutron shield / heat conversion technology (most of the energy in the D+T fusion reaction is released in the form of fast neutrons).
- Experiment with burning plasma state.[53][55]
The objectives of the ITER project are not limited to creating the nuclear fusion device but are much broader, including building necessary technical, organizational, and logistical capabilities, skills, tools, supply chains, and culture enabling management of such megaprojects among participating countries, bootstrapping their local nuclear fusion industries.[90][6]
Timeline and status
[edit]As of April 2022[update] ITER is near 85% complete toward first plasma.[91] First plasma was scheduled for late 2025,[92][93] however delays were acknowledged in 2023 which would impact this target. In July 2024, ITER announced a new schedule which included full plasma current in 2034, the start of operations with a deuterium-deuterium plasma in 2035, and deuterium-tritium operations in 2039.[7]
The start of the project can be traced back to 1978 when the European Commission, Japan, United States, and USSR joined for the International Tokamak Reactor (INTOR) Workshop. This initiative was held under the auspices of the International Atomic Energy Agency and its goals were to assess the readiness of magnetic fusion to move forward to the experimental power reactor (EPR) stage, to identify the additional R&D that must be undertaken, and to define the characteristics of such an EPR by means of a conceptual design. From 1978 to the middle of the 1980s, hundreds of fusion scientists and engineers in each participating country took part in a detailed assessment of the tokamak confinement system and the design possibilities for harnessing nuclear fusion energy.[94][95]
In 1985, at the Geneva summit meeting in 1985, Mikhail Gorbachev suggested to Ronald Reagan that the two countries jointly undertake the construction of a tokamak EPR as proposed by the INTOR Workshop. The ITER project was initiated in 1988.[96]
Ground was broken in 2007[97] and construction of the ITER tokamak complex started in 2013.[98]
Machine assembly was launched on 28 July 2020.[99] The construction of the facility was expected to be completed in 2025 when commissioning of the reactor can commence and initial plasma experiments were scheduled to begin at the end of that year.[100] When ITER becomes operational, it will be the largest magnetic confinement plasma physics experiment in use with a plasma volume of 840 cubic meters,[101] surpassing the Joint European Torus by a factor of 8.
On 3 July 2024, ITER director-general Pietro Barabaschi announced the first plasma production in the project will not take place until, at least, 2033. The energy from magnets will be produced no earlier than 2036, rather than 2033, as previously planned in 2016. He additionally said the cost of repairing some malfunctioning pieces was estimated at €5 billion.[102][8]
Date | Event |
---|---|
1988 | ITER project officially initiated.[103] Conceptual design activities ran from 1988 to 1990.[104] |
1992 | Engineering design activities from 1992[105] to 1998.[106] |
2006 | Approval of a cost estimate of €10 billion (US$12.8 billion) projecting the start of construction in 2008 and completion a decade later.[37] |
2007 | Site construction begins[97] |
2008 | Site preparation start, ITER itinerary start.[107] |
2009 | Site preparation completion.[107] |
2010 | Tokamak complex excavation starts.[108] |
2013 | Tokamak complex construction starts.[107] |
2015 | Tokamak construction starts,[109][110] but the schedule is extended by at least six years.[111] |
2017 | Assembly Hall ready for equipment. |
2018–2023 | Assembly and integration:[112]
|
2024–2033 | Assembly and integration (planned): |
2033–2034 | |
2035 | Planned: start of deuterium–deuterium plasma operation.[7] |
2039 | Planned: start of deuterium–tritium plasma operation.[7] |
Reactor overview
[edit]When deuterium and tritium fuse, two nuclei come together to form a helium nucleus (an alpha particle), and a high-energy neutron.[123]
- 2H + 3H → 4He + 1
0n
+ 17.59 MeV
While nearly all stable isotopes lighter on the periodic table than iron-56 and nickel-62, which have the highest binding energy per nucleon, will fuse with some other isotope and release energy, deuterium and tritium are by far the most attractive for energy generation as they require the lowest activation energy (thus lowest temperature) to do so, while producing among the most energy per unit weight.[124]
All proto- and mid-life stars radiate enormous amounts of energy generated by fusion processes.[125] Deuterium–tritium fusion releases, per mass, roughly three times as much energy as uranium-235 fission, and millions of times more energy than a chemical reaction such as the burning of coal.[126] It is the goal of a fusion power station to harness this energy to produce electricity.
Activation energies (in most fusion systems this is the temperature required to initiate the reaction) for fusion are generally high because the protons in each nucleus strongly repel one another, as they each have the same positive charge. A heuristic for estimating reaction rates is that nuclei must be able to get within 100 femtometers (10−13 meter) of each other, where the nuclei are increasingly likely to undergo quantum tunneling past the electrostatic barrier and the turning point where the strong nuclear force and the electrostatic force are equally balanced, allowing them to fuse. In ITER, this distance of approach is made possible by high temperatures and magnetic confinement. ITER uses cooling equipment like a cryopump to cool the magnets to near absolute zero.[127] High temperatures give the nuclei enough energy to overcome their electrostatic repulsion (see Maxwell–Boltzmann distribution). For deuterium and tritium, the optimal reaction rates occur at temperatures higher than 108 kelvin.[128] At ITER, the plasma will be heated to 150 million kelvin (about ten times the temperature at the core of the Sun)[129] by ohmic heating (running a current through the plasma). Additional heating is applied using neutral beam injection (which cross magnetic field lines without a net deflection and will not cause a large electromagnetic disruption) and radio frequency (RF) or microwave heating.[130]
At such high temperatures, particles have a large kinetic energy, and hence speed. If unconfined, the particles will rapidly escape, taking the energy with them, cooling the plasma to the point where net energy is no longer produced. A successful reactor would need to contain the particles in a small enough volume for a long enough time for much of the plasma to fuse.[131] In ITER and many other magnetic confinement reactors, the plasma, a gas of charged particles, is confined using magnetic fields. A charged particle moving through a magnetic field experiences a force perpendicular to the direction of travel, resulting in centripetal acceleration, thereby confining it to move in a circle or helix around the lines of magnetic flux.[132] ITER will use four types of magnets to contain the plasma: a central solenoid magnet, poloidal magnets around the edges of the tokamak, 18 D-shaped toroidal-field coils, and correction coils.[133]
A solid confinement vessel is also needed, both to shield the magnets and other equipment from high temperatures and energetic photons and particles, and to maintain a near-vacuum for the plasma to populate.[134] The containment vessel is subjected to a barrage of very energetic particles, where electrons, ions, photons, alpha particles, and neutrons constantly bombard it and degrade the structure. The material must be designed to endure this environment so that a power station would be economical. Tests of such materials will be carried out both at ITER and at IFMIF (International Fusion Materials Irradiation Facility).[135]
Once fusion has begun, high-energy neutrons will radiate from the reactive regions of the plasma, crossing magnetic field lines easily due to charge neutrality (see neutron flux). Since it is the neutrons that receive the majority of the energy, they will be ITER's primary source of energy output.[136] Ideally, alpha particles will expend their energy in the plasma, further heating it.[137]
The inner wall of the containment vessel will have 440 blanket modules that are designed to slow and absorb neutrons in a reliable and efficient manner and therefore protect the steel structure and the superconducting toroidal field magnets.[138] At later stages of the ITER project, experimental blanket modules will be used to test breeding tritium for fuel from lithium-bearing ceramic pebbles contained within the blanket module following the following reactions:
- 1
0n
+ 6
3Li
→ 3
1T
+ 4
2He - 1
0n
+ 7
3Li
→ 3
1T
+ 4
2He
+ 1
0n
where the reactant neutron is supplied by the D-T fusion reaction.[139]
Energy absorbed from the fast neutrons is extracted and passed into the primary coolant. This heat energy would then be used to power an electricity-generating turbine in a real power station; in ITER this electricity generating system is not of scientific interest, so instead the heat will be extracted and disposed of.[140]
Technical design
[edit]Vacuum vessel
[edit]The vacuum vessel is the central part of the ITER machine: a double-walled steel container in which the plasma is contained by means of magnetic fields.
The ITER vacuum vessel will be twice as large and 16 times as heavy as any previously manufactured fusion vessel: each of the nine torus-shaped sectors will weigh approximately 450 tonnes. When all the shielding and port structures are included, this adds up to a total of 5,116 tonnes. Its external diameter will measure 19.4 metres (64 ft), the internal 6.5 metres (21 ft). Once assembled, the whole structure will be 11.3 metres (37 ft) high.[134][141]
The primary function of the vacuum vessel is to provide a hermetically sealed plasma container. Its main components are the main vessel, the port structures and the supporting system. The main vessel is a double-walled structure with poloidal and toroidal stiffening ribs between 60-millimetre-thick (2.4 in) shells to reinforce the vessel structure. These ribs also form the flow passages for the cooling water. The space between the double walls will be filled with shield structures made of stainless steel. The inner surfaces of the vessel will act as the interface with breeder modules containing the breeder blanket component. These modules will provide shielding from the high-energy neutrons produced by the fusion reactions and some will also be used for tritium breeding concepts.[141]
The vacuum vessel has a total of 44 openings that are known as ports – 18 upper, 17 equatorial, and 9 lower ports – that will be used for remote handling operations, diagnostic systems, neutral beam injections and vacuum pumping. Remote handling is made necessary by the radioactive interior of the reactor following a shutdown, which is caused by neutron bombardment during operation.[142]
Vacuum pumping will be done before the start of fusion reactions to create the necessary low density environment, which is about one million times lower than the density of air.[143]
Breeder blanket
[edit]ITER will use deuterium-tritium fuel. While deuterium is abundant in nature, tritium is much rarer because it is radioactive with a half-life of just 12.3 years and there are only about 3.5 kg of natural tritium on earth.[144] Owing to this tiny supply of tritium, an important component for testing on ITER is the breeding blanket. This component, located in the ports of the vacuum vessel, serves to test the production of tritium by reaction with neutrons from the plasma. There are several reactions that produce tritium within the blanket.[145] Lithium-6 produces tritium via (n,t) reactions with moderated neutrons, while Lithium-7 produces tritium via interactions with higher energy neutrons via (n,nt) reactions.[146][147]
Concepts for the breeder blanket include helium-cooled lithium lead (HCLL), helium-cooled pebble bed (HCPB), and water-cooled lithium lead (WCLL) methods.[148] Six different tritium breeding blanket mock-ups, known as Test Blanket Modules (TBM), will be tested in ITER and will share a common box geometry.[149] Materials for use as breeder pebbles in the HCPB concept include lithium metatitanate and lithium orthosilicate.[150] Requirements of breeder materials include good tritium production and extraction, mechanical stability and low levels of radioactive activation.[151]
Magnet system
[edit]ITER is based on magnetic confinement fusion that uses magnetic fields to contain the fusion fuel in plasma form. The magnet system used in the ITER tokamak will be the largest superconducting magnet system ever built.[152] The system will use four types of magnets to achieve plasma confinement: a central solenoid magnet, poloidal magnets, toroidal-field coils, and correction coils.[133] The central solenoid coil will be 18 meters tall, 4.3 m wide, and weigh 1000 tonnes.[153] It will use superconducting niobium–tin to carry 45 kA and produce a peak field of more than 13 teslas.[154][155]
The 18 toroidal field coils will also use niobium-tin. They are the most powerful superconductive magnets ever designed with a nominal peak field strength of 11.8 teslas and a stored magnetic energy of 41 gigajoules.[156] Other lower field ITER magnets (poloidal field and correction coils) will use niobium–titanium for their superconducting elements.[157]
Additional heating
[edit]To achieve fusion, plasma particles must be heated to temperatures that reach as high as 150 million °C. To achieve these extreme temperatures, multiple heating methods must be used.[130] Within the tokamak itself, changing magnetic fields produce a heating effect but external heating is also required. There will be three types of external heating in ITER:[158]
- Two one-million volt heating neutral beam injectors (HNB) that will each provide about 16.5MW to the burning plasma, with the possibility to add a third injector. The beams generate electrically charged deuterium ions that are accelerated through five grids to reach the required energy of 1MV and the beams can operate for the entire plasma pulse duration, a total of up to 3600 seconds.[159] The prototype is being built at the Neutral Beam Test Facility (NBTF),[160] which was constructed in Padua, Italy. There is also a smaller neutral beam that will be used for diagnostics to help detect the amount of helium ash inside the tokamak.[161]
- An ion cyclotron resonance heating (ICRH) system that will inject 20 MW of electromagnetic power into the plasma by using antennas to generate radio waves that have the same rate of oscillation as the ions in the plasma.[162]
- An electron cyclotron resonance heating (ECRH) system that will heat electrons in the plasma using a high-intensity beam of electromagnetic radiation.[163]
Cryostat
[edit]The ITER cryostat is a large 3,850-tonne stainless steel structure surrounding the vacuum vessel and the superconducting magnets, with the purpose of providing a super-cool vacuum environment.[164] Its thickness (ranging from 50 to 250 millimetres (2.0 to 9.8 in)) will allow it to withstand the stresses induced by atmospheric pressure acting on the enclosed volume of 8,500 cubic meters.[165] On 9 June 2020, Larsen & Toubro completed the delivery and installation of the cryostat module.[166] The cryostat is the major component of the tokamak complex, which sits on a seismically isolated base.[167][168][169]
Divertor
[edit]The divertor is a device within the tokamak that allows for removal of waste and impurities from the plasma while the reactor is operating. At ITER, the divertor will extract heat and ash that are created by the fusion process, while also protecting the surrounding walls and reducing plasma contamination.[170]
The ITER divertor, which has been compared to a massive ashtray, is primarily composed of tungsten. The divertor targets, which are the components directly exposed to the plasma, are made of tungsten due to its high melting point, low sputtering yield, and low tritium retention. The underlying structure of the divertor includes materials like copper alloy for heat conduction and stainless steel for structural support.
The divertor consists of 54 cassettes. Each cassette weighs roughly eight tonnes and measures 0.8 meters x 2.3 meters by 3.5 meters. The divertor design and construction is being overseen by the Fusion For Energy agency.[171]
When the ITER tokamak is in operation, the plasma-facing units endure heat spikes as high as 20 megawatts per square metre, which is more than four times higher than what is experienced by a spacecraft entering Earth's atmosphere.[172]
The testing of the divertor is being done at the ITER Divertor Test Facility (IDTF) in Russia. This facility was created at the Efremov Institute in Saint Petersburg as part of the ITER Procurement Arrangement that spreads design and manufacturing across the project's member countries.[173]
Cooling systems
[edit]The ITER tokamak will use interconnected cooling systems to manage the heat generated during operation. Most of the heat will be removed by a primary water cooling loop, itself cooled by water from a secondary loop through a heat exchanger within the tokamak building's secondary confinement.[174] The secondary cooling loop will be cooled by a larger complex, comprising a cooling tower, a 5 km (3.1 mi) pipeline supplying water from the Canal de Provence, and basins that allow cooling water to be cooled and tested for chemical contamination and tritium before being released into the river Durance. This system will need to dissipate an average power of 450 MW during the tokamak's operation.[175] A liquid nitrogen system will provide a further 1300 kW of cooling to 80 K (−193.2 °C; −315.7 °F), and a liquid helium system will provide 75 kW of cooling to 4.5 K (−268.65 °C; −451.57 °F). The liquid helium system will be designed, manufactured, installed and commissioned by Air Liquide in France.[176][177]
Location
[edit]The process of selecting a location for ITER was long and drawn out. Japan proposed a site in Rokkasho.[178] Two European sites were considered, the Cadarache site in France and the Vandellòs site in Spain, but the European Competitiveness Council named Cadarache as its official candidate in November 2003.[179] Additionally, Canada announced a bid for the site in Clarington in May 2001, but withdrew from the race in 2003.[180][181]
From this point on, the choice was between France and Japan. On 3 May 2005, the EU and Japan agreed to a process which would settle their dispute by July. At the final meeting in Moscow on 28 June 2005, the participating parties agreed to construct ITER at Cadarache with Japan receiving a privileged partnership that included a Japanese director-general for the project and a financial package to construct facilities in Japan.[182]
Fusion for Energy, the EU agency in charge of the European contribution to the project, is located in Barcelona, Spain. Fusion for Energy (F4E) is the European Union's Joint Undertaking for ITER and the Development of Fusion Energy. According to the agency's website:
F4E is responsible for providing Europe's contribution to ITER, the world's largest scientific partnership that aims to demonstrate fusion as a viable and sustainable source of energy. [...] F4E also supports fusion research and development initiatives [...][183]
The ITER Neutral Beam Test Facility aimed at developing and optimizing the neutral beam injector prototype, is being constructed in Padova, Italy.[184] It will be the only ITER facility out of the site in Cadarache.
Most of the buildings at ITER will or have been clad in an alternating pattern of reflective stainless steel and grey lacquered metal. This was done for aesthetic reasons to blend the buildings with their surrounding environment and to aid with thermal insulation.[185]
Participants
[edit]Currently there are seven signatories to the ITER Agreement: China, the European Union, India, Japan, Russia, South Korea and the United States.[24]
As a consequence of Brexit, the United Kingdom formally withdrew from Euratom on 31 January 2020. However, under the terms of the EU–UK Trade and Cooperation Agreement, the United Kingdom initially remained a member of ITER as a part of Fusion for Energy following the end of the transition period on 31 December 2020.[186][187] However, in 2023, the United Kingdom decided to discontinue its participation in Fusion for Energy, and in 2024 decided not to seek membership in ITER independently of the EU, leaving the UK no longer a participant in the ITER project.[20][21]
In March 2009, Switzerland, an associate member of Euratom since 1979, also ratified the country's accession to the Fusion for Energy as a third country member.[188]
In 2016, ITER announced a partnership with Australia for "technical cooperation in areas of mutual benefit and interest", but without Australia becoming a full member.[79]
In 2017, ITER signed a Cooperation Agreement with Kazakhstan.[80][189]
Thailand also has an official role in the project after a cooperation agreement was signed between the ITER Organization and the Thailand Institute of Nuclear Technology in 2018. The agreement provides courses and lectures to students and scientists in Thailand and facilitates relationships between Thailand and the ITER project.[190]
Canada was previously a full member but pulled out due to a lack of funding from the federal government. The lack of funding also resulted in Canada's withdrawing from its bid for the ITER site in 2003. Canada rejoined the project in 2020 via a cooperation agreement that focused on tritium and tritium-related equipment.[81]
ITER's work is supervised by the ITER Council, which has the authority to appoint senior staff, amend regulations, decide on budgeting issues, and allow additional states or organizations to participate in ITER.[191] The current Chairman of the ITER Council is Won Namkung,[192] and the acting ITER Director-General is Eisuke Tada.
Members
[edit]- European Union
- Switzerland (as a member of Euratom and Fusion for Energy)[193]
- United Kingdom (as a part of Fusion for Energy)[186][187]
- China
- India
- Japan
- Russia
- South Korea
- United States
Non-members
[edit]- Australia (through the Australian Nuclear Science and Technology Organisation (ANSTO) in 2016)[194]
- Canada (through the Government of Canada in 2020, mostly on the grounds of tritium)[195]
- Kazakhstan (through the National Nuclear Center of the Republic of Kazakhstan (NNC-RK) in 2017)[194]
- Thailand (through the Thailand Institute of Nuclear Technology (TINT) in 2018)[196]
Domestic agencies
[edit]Each member of the ITER project – The European Union, China, India, Japan, Korea, Russia, and the United States – has created a domestic agency to meet its contributions and procurement responsibilities. These agencies employ their own staff, have their own budget, and directly oversee all industrial contracts and subcontracting.[197]
ITER EU
[edit]The ITER Agreement was signed by Euratom representing the EU. Fusion for Energy, often referred to as F4E, was created in 2007 as the EU's domestic agency, with headquarters in Barcelona, Spain, and further offices in Cadarache, France, Garching, Germany, and Rokkasho, Japan.[198] F4E is responsible for contributing to the design and manufacture of components such as the vacuum vessel, the divertor, and the magnets.[199]
ITER China
[edit]China's contribution to ITER is managed through the China International Nuclear Fusion Energy Program or the CNDA. The Chinese agency is working on components such as the correction coil, magnet supports, the first wall, and shield blanket.[200] China is also running experiments on their HL-2M tokamak in Chengdu[201] and HT-7U (EAST) in Hefei[202] to help support ITER research.
ITER India
[edit]ITER-India is a special project run by India's Institute for Plasma Research.[203] ITER-India's research facility is based in Ahmedabad in the Gujarat state. India's deliverables to the ITER project include the cryostat, in-vessel shielding, cooling and cooling water systems.[204]
ITER Japan
[edit]Japan's National Institutes for Quantum and Radiological Sciences and Technology, or QST, is now the designated Japanese domestic agency for the ITER project. The organization is based in Chiba, Japan.[205] Japan collaborates with the ITER Organization and ITER members to help design and produce components for the tokamak, including the blanket remote handling system, the central solenoid coils, the plasma diagnostics systems, and the neutral beam injection heating systems.[206]
ITER Korea
[edit]ITER Korea was established in 2007 under Korea's National Fusion Research Institute and the organization is based in Daejeon, South Korea. Among the procurement items that ITER Korea is responsible for four sectors of the vacuum vessel, the blanket shield block, thermal shields, and the tritium storage and delivery system.[207]
ITER Russia
[edit]Russia occupies one of the key positions in the implementation of the international ITER Project.[208] The Russian Federation's contribution to the ITER project lies in the manufacture and supply of high-tech equipment and basic reactor systems. The Russian Federation's contribution is being made under the aegis of Rosatom or the State Atomic Energy Corporation.[209] The Russian Federation has multiple obligations to the ITER project, including the supply of 22 kilometers of conductors based on 90 tonnes of superconducting Nb3Sn strands for winding coils of a toroidal field and 11 km of conductors based on 40 tonnes of superconducting NbTi strands for windings of coils of a poloidal field of the ITER magnetic system,[210] sent in late 2022.[211] Russia is responsible for the manufacture of 179 of the most energy-intensive (up to 5 MW/sq.m) panels of the First Wall. The panels are covered with beryllium plates soldered to CuCrZr bronze, which is connected to a steel base. Panel size up to 2 m wide, 1.4 m high; its mass is about 1000 kg. The obligation of the Russian Federation also includes conducting thermal tests of ITER components that are facing the plasma.[212] Today, Russia, thanks to its participation in the project, has the full design documentation for the ITER reactor.
ITER US
[edit]US ITER is part of the US Department of Energy and is managed by the Oak Ridge National Laboratory in Tennessee.[213] US ITER is responsible for both the design and manufacturing of components for the ITER project, and American involvement includes contributions to the tokamak cooling system, the diagnostics systems, the electron and ion cyclotron heating transmission lines, the toroidal and central solenoid magnet systems, and the pellet injection systems.[214] In 2022, the US fusion research community released its plan for a US ITER Research Program covering key research areas such as plasma-material interactions, plasma diagnostics, and fusion nuclear science and technology. The plan envisions close collaboration between the US and other ITER partners to ensure the successful operation of ITER.[215]
Funding
[edit]In 2006, the ITER Agreement was signed on the basis of an estimated cost of €5.9 billion over a ten-year period. In 2008, as a result of a design review, the estimate was revised upwards to about €19 billion.[216] As of 2016, the total cost of constructing and operating the experiment is expected to be over €22 billion,[27] an increase of €4.6 billion of its 2010 estimate,[217] and of €9.6 billion from the 2009 estimate.[218]
At the June 2005 conference in Moscow the participating members of the ITER cooperation agreed on the following division of funding contributions for the construction phase: 45.4% by the hosting member, the European Union, and the rest split between the non-hosting members at a rate of 9.1% each for China, India, Japan, South Korea, the Russian Federation and the US.[219][220][221] During the operation and deactivation phases, Euratom will contribute to 34% of the total costs;[222] Japan and the United States 13%; and China, India, Korea, and Russia 10%.[223]
90% of contributions will be delivered 'in-kind' using ITER's own currency, the ITER Units of Account (IUAs).[34] Though Japan's financial contribution as a non-hosting member is one-eleventh of the total, the EU agreed to grant it a special status so that Japan will provide for two-elevenths of the research staff at Cadarache and be awarded two-elevenths of the construction contracts, while the European Union's staff and construction components contributions will be cut from five-elevenths to four-elevenths.
The American contribution to ITER has been the subject to debate. The US Department of Energy (USDOE) has estimated the total construction costs to 2025, including in-kind contributions, to be $65 billion, though ITER disputes this calculation.[30] After having reduced funding to ITER in 2017, the United States ended up doubling its initial budget to $122 million in-kind contribution in 2018.[224] It is estimated the total contribution to ITER for the year 2020 was $247 million, an amount that is part of the USDOE's Fusion Energy Sciences program.[225] Under a strategic plan to guide American fusion energy efforts that was approved in January 2021, the USDOE directed the Fusion Energy Sciences Advisory Committee to assume that the US will continue to fund ITER for a ten-year period.[226]
Support for the European budget for ITER has also varied over the course of the project. It was reported in December 2010 that the European Parliament had refused to approve a plan by member states to reallocate €1.4 billion from the budget to cover a shortfall in ITER building costs in 2012–13. The closure of the 2010 budget required this financing plan to be revised, and the European Commission (EC) was forced to put forward an ITER budgetary resolution proposal in 2011.[227] In the end, the European contribution to ITER for the 2014 to 2020 period was set at €2.9 billion.[228] Most recently, in February 2021, the European Council approved ITER financing of €5.61 billion for the period of 2021 to 2027.[229]
Manufacturing
[edit]The construction of the ITER tokamak has been compared to the assembly of “a giant three-dimensional puzzle” because the parts are manufactured around the world and then shipped to France for assembly.[230] This assembly system is the result of the ITER Agreement that stipulates that member contributions were to be mostly “in-kind” with countries manufacturing components instead of providing money. This system was devised to provide economic stimulus and fusion expertise in the countries funding the project and the general framework called for 90% of member contributions to be in material or components and 10% to be in money.[231]
As a result, more than 2800 design or manufacturing contracts have been signed since the launch of the project.[232] According to a 2017 estimate from French Minister for Research, Education and Innovation, Frédérique Vidal, there were 500 companies involved in the construction of ITER and Bernard Bigot stated that €7 billion in contracts had been awarded to prime contractors in Europe alone since 2007.[233][234]
The overall assembly of the tokamak facility is being overseen through a €174-million contract awarded to Momentum, a joint venture between Amec Foster Wheeler (Britain), Assystem (France), and Kepco (South Korea).[235] One of the largest tenders was a €530-million contract for HVAC systems and mechanical and electrical equipment that was awarded to a European consortium involving ENGIE (France) and Exyte (Germany).[236] A tokamak assembly contract worth €200 million also went to a European consortium, Dynamic, that includes the companies Ansaldo Energia (Italy), ENGIE (France), and SIMIC (Italy).[237] The French industrial conglomerate Daher was awarded more than €100 million in logistics contracts for ITER, which includes the shipment of the heavy components from the different manufacturers around the world.[238][239]
In America, US ITER has awarded $1.3 billion in contracts to American companies since the beginning of the project and there is an estimated $800 million in future contracts still to come.[240] The major US contracts include General Atomics being selected to design and manufacture the crucial central solenoid magnet.[241]
In 2019, the Chinese consortium led by China Nuclear Power Engineering Corporation signed a contract for machine assembly at ITER that was the biggest nuclear energy contract ever signed by a Chinese company in Europe.[242]
Russia is supplying magnet and vacuum-injection systems for ITER with construction being done at the Sredne-Nevsky Shipyard in Saint Petersburg.[243]
In India, the contract for construction of the cryostat, one of the fundamental pieces of the tokamak, was awarded to Larsen & Toubro, who also have ITER contracts for water cooling systems.[244] InoxCVA, an Inox Group company will supply cryolines for the ITER Project.[245][246]
Two of Japan's industrial leaders, Toshiba Energy Systems & Solutions and Mitsubishi Heavy Industries, have contracts to manufacture the toroidal field coils for ITER.[243] Construction of another key part of the tokamak, the vacuum vessel, was awarded to Hyundai Heavy Industries and is being built in Korea.[247]
Delays were acknowledged in 2023, which would impact the target to create plasma by 2025; it was hoped the 2035 full-fusion target could be maintained.[248] A new schedule was issued in July 2024, targeting first plasma in the mid-2030s and the start of deuterium-tritium operations by 2039.[7]
Criticism
[edit]The ITER project has been criticized for issues such as its possible environmental impacts, its usefulness as a response to climate change, the design of its tokamak, and how the experiment's objectives have been expressed.
When France was announced as the site of the ITER project in 2005, several European environmentalists stated their opposition to the project. For example, the French politician Noël Mamère argued that the fight against global warming would be neglected as a result of ITER: “This is not good news for the fight against the greenhouse effect because we're going to put ten billion euros towards a project that has a term of 30–50 years when we're not even sure it will be effective."[249] However, another French environmental association, Association des Ecologistes Pour le Nucléaire (AEPN), welcomed the ITER project as an important part of the response to climate change.[6]
Within the broader fusion sector, a number of researchers working on non-tokamak systems, such as the independent fusion scientist Eric Lerner, have argued that other fusion projects would be a fraction of ITER's cost and could be a potentially more viable and/or more cost-effective path to fusion power.[250] Other critics, such as Daniel Jassby, accuse ITER researchers of being unwilling to face up to the technical and economic potential problems posed by tokamak fusion schemes.[251]
In terms of the design of the tokamak, one concern arose from the 2013 tokamak parameters database interpolation that revealed the power load on a tokamak divertor would be five times the previously expected value. Given that the projected power load on the ITER divertor will already be very high, these new findings led to new design testing initiatives.[252]
Another issue that critics raised regarding ITER and future deuterium-tritium (DT) fusion projects is the available supply of tritium. As it stands, ITER will use all existing supplies of tritium for its experiment and the current state-of-the-art technology isn't sufficient to generate enough tritium to fulfill the needs of future DT fuel cycle experiments for fusion energy. According to the conclusion of a 2020 study that analyzed the tritium issue, “successful development of the DT fuel cycle for DEMO and future fusion reactors requires an intensive R&D program in key areas of plasma physics and fusion technologies.”[253]
Responses to criticism
[edit]Proponents believe that much of the ITER criticism is misleading and inaccurate, in particular the allegations of the experiment's "inherent danger". The stated goals for a commercial fusion power station design are that the amount of radioactive waste produced should be hundreds of times less than that of a fission reactor, and that it should produce no long-lived radioactive waste, and that it is impossible for any such reactor to undergo a large-scale runaway chain reaction.[254] A direct contact of the plasma with ITER inner walls would contaminate it, causing it to cool immediately and stop the fusion process. In addition, the amount of fuel contained in a fusion reactor chamber (one half gram of deuterium/tritium fuel[255]) is only sufficient to sustain the fusion burn pulse from minutes up to an hour at most, whereas a fission reactor usually contains several years' worth of fuel.[256] Moreover, some detritiation systems will be implemented, so that, at a fuel cycle inventory level of about 2 kg (4.4 lb), ITER will eventually need to recycle large amounts of tritium and at turnovers orders of magnitude higher than any preceding tritium facility worldwide.[257]
In the case of an accident (or sabotage), it is expected that a fusion reactor would release far less radioactive pollution than would an ordinary fission nuclear station. Furthermore, ITER's type of fusion power has little in common with nuclear weapons technology, and does not produce the fissile materials necessary for the construction of a weapon. Proponents note that large-scale fusion power would be able to produce reliable electricity on demand, and with virtually zero pollution (no gaseous CO2, SO2, or NOx by-products are produced).[258]
According to researchers at a demonstration reactor in Japan, a fusion generator should be feasible in the 2030s and no later than the 2050s. Japan is pursuing its own research program with several operational facilities that are exploring several fusion paths.[259]
In the United States alone, electricity accounts for US$210 billion in annual sales.[260] Asia's electricity sector attracted US$93 billion in private investment between 1990 and 1999.[261] These figures take into account only current prices. Proponents of ITER contend that an investment in research now should be viewed as an attempt to earn a far greater future return and a 2017–18 study of the impact of ITER investments on the EU economy have concluded that 'in the medium and long-term, there is likely to be a positive return on investment from the EU commitment to ITER.'[262] Also, worldwide investment of less than US$1 billion per year into ITER is not incompatible with concurrent research into other methods of power generation, which in 2007 totaled US$16.9 billion.[263]
Supporters of ITER emphasize that the only way to test ideas for withstanding the intense neutron flux is to subject materials experimentally to that flux, which is one of the primary missions of ITER and the IFMIF,[255] and both facilities will be vitally important to that effort.[264] The purpose of ITER is to explore the scientific and engineering questions that surround potential fusion power stations. It is nearly impossible to acquire satisfactory data for the properties of materials expected to be subject to an intense neutron flux, and burning plasmas are expected to have quite different properties from externally heated plasmas.[265] Supporters contend that the answer to these questions requires the ITER experiment, especially in the light of the monumental potential benefits.[266]
Furthermore, the main line of research via tokamaks has been developed to the point that it is now possible to undertake the penultimate step in magnetic confinement plasma physics research with a self-sustained reaction. In the tokamak research program, recent advances devoted to controlling the configuration of the plasma have led to the achievement of substantially improved energy and pressure confinement, which reduces the projected cost of electricity from such reactors by a factor of two to a value only about 50% more than the projected cost of electricity from advanced light-water reactors.[267] In addition, progress in the development of advanced, low activation structural materials supports the promise of environmentally benign fusion reactors and research into alternate confinement concepts is yielding the promise of future improvements in confinement.[268] Finally, supporters contend that other potential replacements to the fossil fuels have environmental issues of their own. Solar, wind, and hydroelectric power all have very low surface power density compared to ITER's successor DEMO which, at 2,000 MW, would have an energy density that exceeds even large fission power stations.[269]
Safety of the project is regulated according to French and EU nuclear power regulations. In 2011, the French Nuclear Safety Authority (ASN) delivered a favorable opinion, and then, based on the French Act on Nuclear Transparency and Safety, the licensing application was subject to public enquiry that allowed the general public to submit requests for information regarding safety of the project. According to published safety assessments (approved by the ASN), in the worst case of reactor leak, released radioactivity will not exceed 1/1000 of natural background radiation and no evacuation of local residents will be required. The whole installation includes a number of stress tests to confirm efficiency of all barriers. The whole reactor building is built on top of almost 500 seismic suspension columns and the whole complex is located almost 300 m above sea level. Overall, extremely rare events such as 100-year flood of the nearby Durance river and 10,000-year earthquakes were assumed in the safety design of the complex and respective safeguards are part of the design.[6]
Between 2008 and 2017, the project has generated 34,000 job-years in the EU economy alone. It is estimated that in the 2018–2030 period, it will generate a further 74,000 job-years and €15.9 billion in gross value.[6]
Similar projects
[edit]Precursors to ITER were JET,[270] Tore Supra,[271] MAST,[272] SST-1, EAST, and KSTAR. Other planned and proposed fusion reactors include NIF,[273] W7X, T-15MD, STEP, SPARC, SST-2,[274] CFETR,[275][276][277][278] DEMO,[279] K-DEMO and other 'DEMO-phase' national or private-sector fusion power plants.[280][281]
See also
[edit]- DEMOnstration Power Plant, generic term for a future class of fusion reactors that produce useful power
- Experimental Advanced Superconducting Tokamak (EAST), China's ongoing effort at Hefei Institutes
- Wendelstein 7-X, an advanced stellarator of Max Planck IPP in Germany for evaluating components of future fusion power plants[282]
Notes
[edit]- ^ Other large projects include the F-35 Fighter Jet Program ($1.5 trillion or $1500 billion), the Manhattan Project ($30.6 billion), the Apollo program ($156 billion), and the James Webb Space Telescope ($9.8 billion).
References
[edit]- ^ "What is ITER?". ITER. 11 January 2021. Retrieved 25 October 2022.
- ^ ITER Technical Basis. Vienna: International Atomic Energy Agency. 2002. Retrieved 12 September 2018.
- ^ "ITER, a reactor in France, may deliver fusion energy power as early as 2045". The Economist. London, England. 4 May 2019. Retrieved 20 March 2021.
Iter (originally, "International Thermonuclear Experimental Reactor", but now rebranded as Latin, thus meaning "journey", "path" or "method") will be a giant fusion reactor of a type called a tokamak.
- ^ "What is Iter". Fusion for Energy. Retrieved 20 March 2021.
- ^ The ITER project. EFDA, European Fusion Development Agreement (2006).
- ^ a b c d e f g h Claessens, Michel (2020). ITER: The Giant Fusion Reactor: Bringing a Sun to Earth. Copernicus. ISBN 978-3-030-27580-8.
- ^ a b c d e f g h "Summary of Presentation by Pietro Barabaschi, ITER Director-General" (PDF). ITER. 3 July 2024. Retrieved 5 July 2024.
- ^ a b Banks, Michael (3 July 2024). "ITER fusion reactor hit by massive decade-long delay and €5bn price hike". Physics World. Retrieved 6 July 2024.
- ^ a b Meade, Dale (2010). "50 years of fusion research". Nuclear Fusion. 50 (1): 014004. Bibcode:2010NucFu..50a4004M. doi:10.1088/0029-5515/50/1/014004. ISSN 0029-5515. S2CID 17802364.
- ^ a b "What Will ITER Do?". ITER. Archived from the original on 26 April 2021. Retrieved 20 March 2021.
- ^ "Main Research Objectives – JT-60SA". Retrieved 6 July 2024.
- ^ Tirone, Jonathan (29 October 2019). "Chasing Unlimited Energy With the World's Largest Fusion Reaction". Bloomberg Businessweek. New York, USA: Bloomberg L.P. Retrieved 20 March 2021.
- ^ Overton, Thomas (1 June 2020). "Fusion Energy Is Coming, and Maybe Sooner Than You Think". Power. Rockville, MD, USA: Power Group. Retrieved 20 March 2021.
- ^ "Facts & Figures". ITER. Retrieved 25 November 2017.
- ^ a b "DOE National Laboratory Makes History by Achieving Fusion Ignition". 13 December 2022. Retrieved 13 December 2022.
- ^ "Power Supply". ITER. Retrieved 25 November 2017.
- ^ "Will ITER make more energy than it consumes?". www.jt60sa.org. Archived from the original on 2 April 2019. Retrieved 12 September 2018.
- ^ Fountain, Henry (27 March 2017). "A Dream of Clean Energy at a Very High Price". The New York Times. New York, USA. Retrieved 20 March 2021.
- ^ Coblentz, Laban (11 January 2021). "Brexit | The UK will remain part of ITER". ITER. Retrieved 7 May 2024.
- ^ a b Matthews, David (11 September 2023). "UK mulls associate membership of ITER fusion project after ditching full participation". Science|Business. Retrieved 7 May 2024.
- ^ a b Sparkes, Matthew (1 March 2024). "UK spurns European invitation to join ITER nuclear fusion project". New Scientist. Retrieved 7 May 2024.
- ^ Bradley, Simon (2 May 2022). "EU-Swiss political deadlock throws shadow over nuclear fusion research". SWI swissinfo.ch. Retrieved 7 May 2024.
- ^ "ITER Members". ITER. Retrieved 7 May 2024.
- ^ a b "ITER Members". ITER. Retrieved 20 March 2021.
- ^ "ITER Tokamak complex construction begins". Nuclear Engineering International. 24 June 2013. Retrieved 20 March 2021.
- ^ Paul Rincon (28 July 2020). "Iter: World's largest nuclear fusion project begins assembly". BBC. Retrieved 20 March 2021.
- ^ a b De Clercq, Geert (7 October 2016). "Nuclear fusion reactor ITER's construction accelerates as cost estimate swells". London, England: Reuters. Retrieved 20 March 2021.
- ^ Hutt, Rosamond (14 May 2019). "Scientists just got closer to making nuclear fusion work". World Economic Forum. Retrieved 20 March 2021.
- ^ Claessens, Michel (29 May 2020). "Breakthrough at the ITER Fusion Reactor Paves Way for Energy Source That May Alter the Course of Civilization". New York, USA: Newsweek. Retrieved 20 March 2021.
- ^ a b Kramer, David (16 April 2018). "ITER disputes DOE's cost estimate of fusion project". Physics Today. No. 4. College Park, MD, USA: American Institute of Physics. doi:10.1063/PT.6.2.20180416a. Retrieved 20 March 2021.
- ^ Clery, Daniel (27 June 2013). "Inside the Most Expensive Science Experiment Ever". Popular Science. Winter Park, FL, USA: Bonnier Corporation. Retrieved 20 March 2021.
- ^ Cohen, Ariel (7 August 2020). "ITER, The World's Largest Nuclear Fusion Project: A Big Step Forward". Forbes. New York, USA: Integrated Whale Media. Retrieved 20 March 2021.
- ^ Parisi, Jason; Ball, Justin (2019). The Future of Fusion Energy. Singapore: World Scientific. doi:10.1142/9781786345431_0007. ISBN 978-1-78634-542-4. S2CID 239317702.
- ^ a b "France gets nuclear fusion plant". BBC. 28 June 2005. Retrieved 20 March 2021.
- ^ "The demonstration power plant: DEMO". EUROfusion. Retrieved 20 March 2021.
- ^ "What is nuclear fusion?". Max Planck Institute for Plasma Physics. Retrieved 20 March 2021.
- ^ a b c "Green light for nuclear fusion project". New Scientist. 21 November 2006. Retrieved 13 September 2009.
- ^ Delbert, Caroline (23 February 2021). "This Fuel Is About to Power the World's Biggest Fusion Reactor". Popular Science. Winter Park, FL, USA: Bonnier Corporation. Retrieved 20 March 2021.
- ^ "Fusion fuels". ITER. Retrieved 24 October 2011.
- ^ Pearson, Richard J.; Antoniazzi, Armando B.; Nuttall, William J. (2018). "Tritium supply and use: A key issue for the development of nuclear fusion energy" (PDF). Fusion Engineering and Design. 136: 1140–1148. Bibcode:2018FusED.136.1140P. doi:10.1016/j.fusengdes.2018.04.090. S2CID 53560490.
- ^ "China launches Iter tritium breeding project". London, England: World Nuclear News. 17 March 2021. Retrieved 20 March 2021.
- ^ Brans, Pat (18 May 2020). "Perfecting Tritium Breeding for DEMO and Beyond". ITER Newsline. St. Paul-lez-Durance, France: ITER. Retrieved 20 March 2021.
- ^ "Is nuclear fusion the answer?". The Week. New York, NY, USA: Adam Dub. 22 February 2021. Retrieved 29 March 2021.
- ^ Brumfiel, Geoff (7 July 2010). "EU research funds to be diverted to fusion reactor". Nature. London, England: Springer Nature Group. Retrieved 20 March 2021.
- ^ Clery, Daniel (16 June 2016). "Fusion megaproject confirms 5-year delay, trims costs". Science. Washington, D.C., USA: American Association for the Advancement of Science. Retrieved 20 March 2021.
- ^ Guguen, Guillaume (31 July 2020). "Power from an artificial sun: Fusion reactor project aims to provide clean energy". France 24. Paris, France: France Médias Monde. Retrieved 20 March 2021.
- ^ Carrington, Damien (28 July 2020). "World's largest nuclear fusion project begins assembly in France". The Guardian. London, England. Retrieved 20 March 2021.
- ^ "The way ahead for fusion". Nature Physics. Vol. 16, no. 9. London, England: Springer Nature Group. 20 August 2020. p. 889. doi:10.1038/s41567-020-01043-9. Retrieved 28 August 2020.
- ^ "History of fusion". EUROfusion. Retrieved 20 March 2021.
- ^ "Plasma energy breakeven vs engineering breakeven". St. Paul-lez-Durance, France: iter.org. Retrieved 6 December 2021.
- ^ Nathan, Stuart (3 January 2019). "Beyond ITER: next steps for fusion power". The Engineer. London, England: Mark Allen Group. Retrieved 28 August 2020.
- ^ "Why the EU supports fusion research and innovation". European Commission. Retrieved 20 March 2021.
- ^ a b Brans, Pat. "What is a burning plasma?". St. Paul-lez-Durance, France: iter.org. Retrieved 30 November 2021.
- ^ Zylstra, A. B.; et al. (2022). "Burning plasma achieved in inertial fusion". Nature. 601 (7894): 542–548. Bibcode:2022Natur.601..542Z. doi:10.1038/s41586-021-04281-w. PMC 8791836. PMID 35082418.
- ^ a b "More info on burning plasma". St. Paul-lez-Durance, France: iter.org. Retrieved 30 November 2021.
- ^ "INTOR: The international fusion reactor that never was". ITER. Retrieved 4 April 2022.
- ^ IAEA. "International Tokamak Reactor". Nucleus. Retrieved 4 April 2022.
- ^ Clery, Daniel (2013). A Piece of the Sun: The Quest for Fusion Energy. New York, NY, USA: Abrams Press. pp. 243–44. ISBN 978-1-4683-0493-0.
- ^ Educational Foundation for Nuclear Science, Inc. (October 1992). "Bulletin of the Atomic Scientists". Bulletin of the Atomic Scientists: Science and Public Affairs. Educational Foundation for Nuclear Science, Inc.: 9–. ISSN 0096-3402.
- ^ Braams, Cornelius Marius; Stott, Peter E. (2010). Nuclear Fusion: Half a Century of Magnetic Confinement Fusion Research. Bristol, Pennsylvania: IOP Publishing. p. 250. Bibcode:2002nfhc.book.....B. doi:10.1088/0741-3335/44/8/701. ISBN 978-0-7503-0705-5.
- ^ Arnoux, Robert (16 November 2015). "Conceived in Geneva, Born in Reykjavik, Bapitized in Vienna". ITER Newsline. St. Paul-lez-Durance, France: ITER. Retrieved 20 March 2021.
- ^ a b c Robinson, Mark (10 October 2020). "Big Science Collaborations; Lessons for Global Governance and Leadership". Global Policy. Vol. 12, no. 1. Hoboken, NJ, US: Wiley-Blackwell. pp. 66–80. doi:10.1111/1758-5899.12861. Retrieved 28 March 2021.
- ^ Bonner, Elena (1 December 2005). "Sakharov is Tokamak's Originator". Physics Today. Vol. 58, no. 12. College Park, MD, US: American Institute of Physics. p. 15. doi:10.1063/1.2169425. Retrieved 20 March 2021.
- ^ "Time to stand up". Nature Reviews Physics. London, England: Springer Nature Group. 5 June 2019. Retrieved 28 August 2020.
- ^ "The ITER initiative". EUROfusion. 3 July 2005. Retrieved 20 March 2021.[permanent dead link]
- ^ "Joint Soviet-United States Statement on the Summit Meeting in Geneva". Ronald Reagan Presidential Library & Museum. 21 November 1985. Retrieved 20 March 2021.
- ^ a b c Harding, Todd K.; Khanna, Melanie; Orbach, Raymond L. (3 September 2012). "International Fusion Energy Cooperation: ITER as a Case Study in Science and Diplomacy". Science & Diplomacy. Washington, DC, US: AAAS Center for Science Diplomacy. Retrieved 28 March 2021.
- ^ "IAEA Newsletters". Retrieved 20 March 2021.
- ^ Shimomura, Y.; Aymar, R.; Chuyanov, V.; Huguet, M.; Parker, R. "ITER Overview" (PDF). Vienna, Austria: IAEA. Retrieved 20 March 2021.
- ^ "Summary of the ITER Final Design Report" (PDF). Vienna, Austria: IAEA. 1 July 2001. Retrieved 20 March 2021.
- ^ Griffith, Sabina (19 December 2007). "The ITER Design – Updated". ITER Newsline. St. Paul-lez-Durance, France: ITER. Retrieved 20 March 2021.
- ^ Wang, Hongyi; Hu, Yinan (8 January 2008). "China to contribute $1.4b for nuclear reactor". China Daily. Beijing, China: Chinese Communist Party State Council Information Office. Retrieved 20 March 2021.
- ^ "S. Korea joins fusion energy research project". Power Engineering. Tulsa, OK, US: Clarion Events. 2 July 2003. Retrieved 20 March 2021.
- ^ "India's Contribution to ITER". Archived from the original on 16 April 2021. Retrieved 20 March 2021.
- ^ Butler, Declan (29 June 2005). "Japan consoled with contracts as France snares fusion project". Nature. London, England: Springer Nature Group. Retrieved 20 March 2021.
- ^ "States sign nuclear energy pact". BBC News. 21 November 2006. Retrieved 5 May 2010.
- ^ "The ITER Organization". Retrieved 20 March 2021.
- ^ "Australian scientists sign historic deal with ITER, the next step fusion experiment". Canberra, Australia: Australian National University. 30 September 2016. Archived from the original on 12 March 2021. Retrieved 20 March 2021.
- ^ a b "Welcome Australia!". ITER Newsline. St. Paul-lez-Durance, France: ITER. 3 October 2016. Retrieved 20 March 2021.
- ^ a b "ITER Signs Cooperation Agreement with Kazakhstan". ITER Newsline. St. Paul-lez-Durance, France: ITER. 12 June 2017. Retrieved 20 March 2021.
- ^ a b "Canada agrees to participate in ITER fusion project". World Nuclear News. London, England: World Nuclear Association. 21 October 2020. Retrieved 20 March 2021.
- ^ O'Sullivan, Kevin (28 July 2020). "World's largest nuclear fusion project begins a new phase in France". The Irish Times. Dublin, Ireland: Irish Times Trust. Retrieved 20 March 2021.
- ^ "Governance". Retrieved 20 March 2021.
- ^ "EXTRAORDINARY ITER COUNCIL APPOINTS NEW DIRECTOR-GENERAL". ITER Newsline. St. Paul-lez-Durance, France: ITER. 8 March 2019. Retrieved 30 November 2021.
- ^ Gibney, Elizabeth (16 September 2022). "World's largest fusion experiment ITER appoints new chief". Nature. doi:10.1038/d41586-022-02976-2. PMID 36114423. S2CID 252334550.
- ^ Butler, Declan (21 November 2014). "ITER's new chief will shake up troubled fusion reactor". Nature. London, England: Springer Nature Group. Retrieved 20 March 2021.
- ^ "Bernard Bigot Accepts a Second Term". ITER Newsline. St. Paul-lez-Durance, France: ITER. 28 January 2019. Retrieved 20 March 2021.
- ^ "French scientist leading nuclear fusion project dies at 72". ABC News. 14 May 2022. Retrieved 15 May 2022.
- ^ "What Is ITER?". Retrieved 20 March 2021.
- ^ "What Will ITER Do?". Retrieved 20 March 2021.
- ^ "ITER Project The building works required for First Plasma are 85% complete | US ITER". www.iter.org. Retrieved 28 November 2023.
- ^ "It's now official: First Plasma in December 2025". ITER. Retrieved 23 June 2021.
- ^ "On the road to ITER: Milestones". Retrieved 5 August 2021.
- ^ Stacey, Weston (2010). The Quest for a Fusion Energy Reactor: An Insider's Account of the INTOR Workshop. Oxford, England: Oxford University Press. ISBN 978-0-19-973384-2.
- ^ Arnoux, Robert (15 December 2008). "INTOR: The International Fusion Reactor That Never Was". ITER Newsline. St. Paul-lez-Durance, France: ITER. Retrieved 20 March 2021.
- ^ "The Geneva Summit". Milestones in the History of the ITER Project. ITER. November 1985. Retrieved 12 September 2012.
- ^ a b "ITER Organization 2007 Annual Report" (PDF). ITER. Retrieved 3 November 2023.
- ^ "Construction starts of Iter tokamak complex". London, England: World Nuclear News. 13 December 2013. Retrieved 20 March 2021.
- ^ a b Tidey, Alice (28 July 2020). "World's largest nuclear fusion project being assembled in France". euronews. Retrieved 28 July 2020.
- ^ Delbert, Caroline (28 April 2020). "30 Years Later, This Big Boy Fusion Reactor is Almost Ready to Turn On". Popular Mechanics. Winter Park, FL, US: Bonnier Corporation. Retrieved 20 March 2021.
- ^ "Facts & Figures". Retrieved 12 September 2018.
- ^ "Iter : un surcoût pharaonique pour ce réacteur nucléaire expérimental". L'Express (in French). 3 July 2024. Archived from the original on 3 July 2024. Retrieved 3 July 2024.
- ^ "The ITER Story". Retrieved 2 April 2021.
- ^ "On the road to ITER: milestones". Retrieved 12 September 2018.
- ^ "On the road to ITER: milestones". Retrieved 12 September 2018.
- ^ "On the road to ITER: milestones". Retrieved 12 September 2018.
- ^ a b c "Approved! Council gives project green light to proceed". ITER & Beyond. The Phases of ITER. ITER. September 2012. Archived from the original on 22 September 2012. Retrieved 12 September 2012.
- ^ "Project Milestones". Retrieved 2 April 2021.
- ^ ITER (19 November 2015). "ITER Project progressing well despite delays" (PDF). Retrieved 20 January 2016.
- ^ First machine components reach ITER. December 2015, ITER.
- ^ Clery, Daniel (19 November 2015). "ITER fusion project to take at least 6 years longer than planned". Science. Retrieved 16 February 2016.
- ^ When will experiments begin? ITER. Accessed April 2018.
- ^ "A fully formed crown". Retrieved 27 July 2019.
- ^ "A "magic moment" – Cryostat 60% complete". 23 July 2019.
- ^ "Industrial milestone | Korea completes first vacuum vessel sector". ITER. Retrieved 16 November 2020.
- ^ "'Got my fingers crossed.' As ITER fusion project marks milestone, chief ponders pandemic impact". 27 May 2020.
- ^ "First welding on the vacuum vessel". Retrieved 26 October 2020.
- ^ "US ITER delivers first central solenoid module". Iter. 9 September 2021. Retrieved 5 July 2024.
- ^ "US ITER delivers second central solenoid module". Iter. 14 October 2021. Retrieved 5 July 2024.
- ^ "Tokamak assembly THE "MODULE" HAS LANDED". Retrieved 2 June 2022.
- ^ "US ITER delivers third central solenoid module". Iter. 20 July 2023. Retrieved 5 July 2024.
- ^ "US delivers 4th central solenoid module". Iter. 22 December 2023. Retrieved 5 July 2024.
- ^ "Nuclear Fusion". Georgia State University. Retrieved 29 January 2021.
- ^ National Research Council (1980). Energy in Transition: 1985–2010. Washington, DC, US: National Academies Press. doi:10.17226/11771. ISBN 978-0-309-03331-2.
- ^ "Nuclear Fusion in Protostars". University Park, PA, US: Penn State College of Earth and Mineral Sciences. Retrieved 20 March 2021.
- ^ "Energy Fundamentals". Leipzig, Germany: Universität Leipzig. Retrieved 20 March 2021.
- ^ "Cryogenics". Retrieved 20 March 2021.
- ^ "Attaining perfect fusion conditions". EUROfusion. Retrieved 28 March 2021.
- ^ Gronewold, Nathanial (24 July 2019). "World's Largest Nuclear Fusion Experiment Clears Milestone". Scientific American.
It will contain the world's largest superconducting magnets, needed to generate a magnetic field powerful enough to contain a plasma that will reach temperatures of 150 million degrees Celsius, about 10 times hotter than the center of the sun.
- ^ a b "Reaching 150,000,000 °C". Retrieved 1 April 2021.
- ^ "New insights could help tame speedy ions in fusion plasmas". Rockville, MD, US: Science Daily. 21 October 2019. Retrieved 20 March 2021.
- ^ "Plasma Confinement". Retrieved 1 April 2021.
- ^ a b Clery, Daniel (29 September 2011). "Magnetic challenges for ITER". Physics World. Bristol, UK: IOP Publishing. Retrieved 29 March 2021.
- ^ a b "Vacuum Vessel". Retrieved 1 April 2021.
- ^ Knaster, Juan; Heidinger, Roland; O'hira, Shigeru (11 January 2016). "IIFMIF/EVEDA: A Round-Up of Material Testing Activity". ITER Newsline. St. Paul-lez-Durance, France: ITER. Retrieved 20 March 2021.
- ^ "Making It Work". Retrieved 1 April 2021.
- ^ Hurricane, O. A.; Callahan, D. A.; Yeamans, C. (11 April 2016). "Inertially confined fusion plasmas dominated by alpha-particle self-heating". Nature Physics. London, England: Springer Nature Group. Retrieved 28 August 2020.
- ^ "Blanket". Retrieved 1 April 2021.
- ^ "Fusion Ceramics". Karlsruhe, Germany: Karlsruhe Institute of Technology. 26 August 2020. Retrieved 20 March 2021.
- ^ "Moving 10 Tonnes of Water Per Second". ITER Newsline. St. Paul-lez-Durance, France: ITER. 23 September 2019. Retrieved 28 March 2021.
- ^ a b Griffith, Sabina (20 November 2009). "ITER and Europe Sign Vacuum Vessel Procurement Arrangement". ITER Newsline. St. Paul-lez-Durance, France: ITER. Retrieved 20 March 2021.
- ^ "A Very International Effort". ITER Newsline. St. Paul-lez-Durance, France: ITER. 17 June 2019. Retrieved 28 March 2021.
- ^ "Vacuum System". iter.org. Retrieved 1 April 2021.
- ^ "Tritium: a challenging fuel for fusion". EUROfusion. Archived from the original on 4 September 2019. Retrieved 20 March 2021.
- ^ "Tritium Breeding". Retrieved 2 April 2021.
- ^ Arnoux, Robert. "Tritium: Changing Lead Into Gold". ITER Mag 14. St. Paul-lez-Durance, France: ITER. Retrieved 20 March 2021.
- ^ Indah, Rosidah M.; Zaki, Suud; Putranto, Yazid (30 September 2015). "Optimization of tritium breeding and shielding analysis to plasma in ITER fusion reactor". In Acep Purqon; Taufiq Hidayat; Reuben Jih-Ru Hwu; Hidetaka Arimura (eds.). The 5th International Conference on Mathematics and Natural Sciences. Vol. 1677. College Park, MD: AIP Publishing. p. 070021. doi:10.1063/1.4930725. ISBN 978-0-7354-1324-5.
- ^ Federici, G.; Boccaccini, L.; Cismondi, F.; Gasparotto, M.; Poitevin, Y.; Ricapito, I. (1 April 2019). "An Overview of the EU breeding blanket design strategy as an integral part of the DEMO design effort". Fusion Engineering and Design. 141. Amsterdam, Netherlands: Elsevier: 30–42. Bibcode:2019FusED.141...30F. doi:10.1016/j.fusengdes.2019.01.141.
- ^ Giancarli, Luciano (7 November 2016). "Committee Reviews Progress on Test Blanket Modules". ITER Newsline. St. Paul-lez-Durance, France: ITER. Retrieved 20 March 2021.
- ^ Hanaor, D.A.H.; Kolb, M.H.H.; Gan, Y.; Kamlah, M.; Knitter, R. (2014). "Solution based synthesis of mixed-phase materials in the Li2TiO3-Li4SiO4 system". Journal of Nuclear Materials. 456: 151–161. arXiv:1410.7128. Bibcode:2015JNuM..456..151H. doi:10.1016/j.jnucmat.2014.09.028. S2CID 94426898.
- ^ Gan, Y; Hernandez, F; et al. (2014). "Thermal Discrete Element Analysis of EU Solid Breeder Blanket Subjected to Neutron Irradiation". Fusion Science and Technology. 66 (1): 83–90. arXiv:1406.4199. Bibcode:2014FuST...66...83G. CiteSeerX 10.1.1.748.6005. doi:10.13182/FST13-727. S2CID 51903434.
- ^ "Magnets". Retrieved 2 April 2021.
- ^ Dulon, Krista (7 November 2016). "Packing a Punch". ITER Newsline. St. Paul-lez-Durance, France: ITER. Retrieved 12 March 2010.
- ^ "First Module Gets Clean Bill of Health". ITER Newsline. St. Paul-lez-Durance, France: ITER. 1 February 2021. Retrieved 12 March 2010.
- ^ "Elements of Support Cage Arrive". ITER Newsline. St. Paul-lez-Durance, France: ITER. 1 February 2021. Retrieved 12 March 2010.
- ^ "First ITER Magnet Arrives This Year". ITER Newsline. St. Paul-lez-Durance, France: ITER. 7 January 2019. Retrieved 12 March 2021.
- ^ "Correction Coils: From Qualification to Production". ITER Newsline. St. Paul-lez-Durance, France: ITER. 6 March 2017. Retrieved 12 March 2021.
- ^ "External Heating Systems". Retrieved 2 April 2021.
- ^ Arnoux, Robert (8 April 2019). "The System That Makes the Tokamak Feel Small". ITER Newsline. St. Paul-lez-Durance, France: ITER. Retrieved 20 March 2021.
- ^ "Archived copy" (PDF). Archived from the original (PDF) on 10 October 2016. Retrieved 9 October 2016.
{{cite web}}
: CS1 maint: archived copy as title (link) - ^ Chakraborty, Arun; Bandyopadhyay, Indranil (9 July 2010). "Development of ITER's Diagnostic Neutral Beam". ITER Newsline. St. Paul-lez-Durance, France: ITER. Retrieved 20 March 2021.
- ^ Brans, Pat (13 January 2020). "How to Pump 20MW of Power Into 1 Gram of Plasma". ITER Newsline. St. Paul-lez-Durance, France: ITER. Retrieved 20 March 2021.
- ^ "Electron Cyclotron Heating". US ITER. Oak Ridge, Tennessee. 22 May 2020. Retrieved 20 March 2021.
- ^ "Cryostat". iter.org. Retrieved 2 April 2021.
- ^ "Nuclear fusion win for Larsen & Toubrot". 12 September 2012. Retrieved 2 January 2013.
- ^ "L&T-made major cryostat base installed in world's largest nuclear fusion project in France". Zee Business. 9 June 2020. Retrieved 10 June 2020.
- ^ "Shake, rattle and roll". iter.org. 7 May 2010. Retrieved 11 November 2021.
- ^ "Foundations". iter.org. Retrieved 11 November 2021.
- ^ "The Seismic Pit basemat is now complete".
- ^ "Cryogenics".
- ^ "European Prototypes for ITER Divertor Cassettte completed". 2 May 2018.
- ^ Beaton, Will (30 March 2020). "Far More than a Fancy Ashtray". St. Paul-lez-Durance, France: ITER.
- ^ Kuznetcov, Vladimir; Gorbenko, Aleksandr (1 October 2014). "Status of the IDTF high-heat flux test facility". Fusion Engineering and Design. 89 (7–8). Amsterdam, Netherlands: Elsevier: 955–959. Bibcode:2014FusED..89..955K. doi:10.1016/j.fusengdes.2014.04.064.
- ^ Arnoux, Robert (27 January 2020). "From River to Droplets and Mist". ITER Newsline. St. Paul-lez-Durance, France: ITER. Retrieved 20 March 2021.
- ^ "Cooling Water". Retrieved 2 April 2021.
- ^ "World's largest cryogenic plant to be installed in ITER fusion reactor". Science World Report. December 2012. Retrieved 31 December 2012.
- ^ "EUR 83 million contract signed for Liquid Helium Plant". 21 December 2012. Retrieved 31 December 2012.
- ^ "Time for Japan to shine?". Nature. London, England: Springer Nature Group. 26 February 2004. Retrieved 28 August 2020.
- ^ "Council reaches a unanimous decision on Europe's ITER candidate site". European Commission. Retrieved 20 March 2021.
- ^ Dalton, Rex (10 May 2001). "Canada stakes claim on fusion energy project". Nature. London, England: Springer Nature Group. Retrieved 20 March 2021.
- ^ Brumfiel, Geoff (30 October 2003). "Canada prepares to pull the plug on fusion project". Nature. London, England: Springer Nature Group. Retrieved 20 March 2021.
- ^ "Europe beats Japan to ITER prize". Physics World. Bristol, UK: IOP Publishing. 28 June 2005. Retrieved 29 March 2021.
- ^ The EU's Fusion for Energy website Archived 3 October 2010 at the Wayback Machine. Fusionforenergy.europa.eu (19 April 2007). Retrieved 2013-05-21.
- ^ The Consorzio RFX website Archived 1 September 2009 at the Wayback Machine, where the ITER Neutral Beam Test Facility is host
- ^ Arnoux, Robert (17 June 2013). "Mirror, Mirror on the Platform". ITER Newsline. St. Paul-lez-Durance, France: ITER. Retrieved 20 March 2021.
- ^ a b Coblentz, Laban (27 January 2020). "The UK Will Remain Part of ITER". ITER Newsline. St. Paul-lez-Durance, France: ITER. Retrieved 11 January 2021.
- ^ a b "Post Brexit: A new beginning for the United Kingdom". F4E Newsline. F4E. 2 February 2021. Retrieved 20 November 2021.
- ^ "Switzerland officializes ITER participation". iter.org. 29 May 2009. Retrieved 1 May 2014.
- ^ "Kazakhstan Offers To Join International Fusion Power Project". RIA Novosti. Retrieved 14 July 2007.
- ^ "A Princess Royal With a Passion for Science". ITER Newsline. St. Paul-lez-Durance, France: ITER. 17 December 2018. Retrieved 11 January 2021.
- ^ "ITER Council, ITER's top authority". ITER.org.
- ^ "Won Namkung takes helm of the ITER Council" (PDF). ITER.org. 12 January 2016. Retrieved 23 November 2016.
- ^ "Switzerland officializes ITER participation". 29 May 2009.
- ^ a b "ITER MEMBERS". ITER.
- ^ "Cooperation | Canada returns to the table". ITER. Retrieved 16 November 2020.
- ^ "Visit | A Princess Royal with a passion for science". ITER. Retrieved 16 November 2020.
- ^ "Who does what?". ITER.
- ^ "Who we are". Fusion for Energy.
- ^ "Manufacturing for ITER". ITER.
- ^ "ITER In China". Archived from the original on 16 April 2021. Retrieved 5 April 2021.
- ^ "Fusion projects make progress in 2020". Nuclear Engineering International. 3 February 2021. Archived from the original on 5 July 2021. Retrieved 25 May 2021.
- ^ Ding, B. J.; et al. (2015). "Study of lower hybrid current drive towards long-pulse operation with high performance in EAST". Radio Frequency Power in Plasmas. AIP Conference Proceedings. 1689 (1). EURATOM: 080002. Bibcode:2015AIPC.1689h0002D. doi:10.1063/1.4936525.
- ^ "ITER-India, Institute for Plasma Research". Archived from the original on 16 April 2021. Retrieved 5 April 2021.
- ^ "Overview of Indian Deliverables to ITER". Archived from the original on 25 May 2021. Retrieved 25 May 2021.
- ^ "ITER Japan Domestic Agency". Archived from the original on 25 May 2021. Retrieved 25 May 2021.
- ^ "In-kind procurement for Japan". Archived from the original on 15 December 2022. Retrieved 25 May 2021.
- ^ "주요사업내용 | ITER 한국사업 | ITER | 연구분야". 한국핵융합에너지연구원.
- ^ "Iter Russia".
- ^ "Rosatom". Archived from the original on 28 August 2019. Retrieved 26 May 2021.
- ^ "Contracts for ITER components awarded". 4 October 2012. Retrieved 27 September 2022.
- ^ "Despite conflict, Russia sends France giant magnet for nuclear fusion project". www.euractiv.com. 2 November 2022.
- ^ "Russia's Contribution". Archived from the original on 26 May 2021. Retrieved 26 May 2021.
- ^ "Project History | US ITER". www.usiter.org.
- ^ "US Hardware Contributions to ITER | US ITER". www.usiter.org. Archived from the original on 25 May 2021. Retrieved 25 May 2021.
- ^ "Fusion Energy Sciences Research Needs Workshop". www.iterresearch.us.
- ^ "European Joint Undertaking for ITER and the Development of Fusion Energy". European Parliament. Retrieved 20 March 2021.
- ^ "EU member states agree on Iter funding shortfall", BBC, 13 July 2010.
- ^ "Fusion falters under soaring costs", BBC, 17 June 2009 (accessed 18 June 2009).
- ^ Amos, Jonathan (14 October 2010). "Key component contract for Iter fusion reactor". BBC News. Retrieved 21 May 2013.
- ^ ITER – Our Contribution Archived 21 October 2015 at the Wayback Machine. Europa (web portal). Retrieved 21 May 2013.
- ^ Lengthy ITER dispute concludes in favour of France. European Commission press release. Cordis.europa.eu (28 June 2005). Retrieved 21 May 2013.
- ^ ITER & Fusion Research press release. Europa (web portal), 5 May 2011. Retrieved 19 November 2011.
- ^ "Frequently Asked Questions". ITER. Retrieved 28 July 2020.
- ^ De Clercq, Geert (26 March 2018). "ITER nuclear fusion project avoids delays as U.S. doubles budget". London, England: Reuters. Retrieved 28 March 2021.
- ^ Cho, Adrian (8 December 2020). "U.S. physicists rally around ambitious plan to build fusion power plant". Science.
- ^ "DOE Fusion Panel Approves Long-Range Plan". College Park, MD, US: AIP Publishing. 7 January 2021. Retrieved 20 March 2021.
- ^ Nuclear fusion finance plan rejected by EU Parliament, BBC, 16 December 2010 (accessed 19 December 2010).
- ^ Mitev, Lubomir (27 November 2013). "European Commission Proposes Changers to Iter financing". Brussels, Belgium: NucNet. Retrieved 20 March 2021.
- ^ "Fusion energy: Council approves ITER financing". European Council. 22 February 2021. Retrieved 20 March 2021.
- ^ Ganley, Elaine (28 July 2020). "France's global nuclear fusion device a puzzle of huge parts". The Associated Press. New York, US. Retrieved 29 August 2021.
- ^ "ITER Reports on Progress". Nuclear Engineering International. 6 December 2016. Retrieved 20 September 2021.
- ^ "Manufacturing for ITER?". Retrieved 26 June 2021.
- ^ "ITER Industry Day". European Commission. Retrieved 29 July 2021.
- ^ "At the ITER worksite". Invest in Provence. Retrieved 1 October 2021.
- ^ "ITER: Will the world's biggest fusion project change the future of energy?". Power Technology. 19 October 2016. Retrieved 29 September 2021.
- ^ "Largest European Iter contract so far". World Nuclear News. London, England: World Nuclear Association. 1 November 2013. Retrieved 8 August 2021.
- ^ "Dynamic contracted for ITER tokamak assembly". World Nuclear News. London, England: World Nuclear Association. 30 September 2019. Retrieved 8 September 2021.
- ^ "DAHER selected as ITER logistics service provider". Nuclear Engineering International. 20 February 2012. Retrieved 15 October 2021.
- ^ "Europe signs a Eur 100 million contract for global logistics". ITER Newsline. St. Paul-lez-Durance, France: ITER. 30 March 2015. Retrieved 15 October 2021.
- ^ "US ITER Participants". US ITER. Oak Ridge, Tennessee. Retrieved 7 July 2021.
- ^ "ITER Reports on Progress". Nuclear Engineering International. 15 June 2021. Retrieved 20 September 2021.
- ^ "Chinese consortium signs ITER contract". World Nuclear News. London, England: World Nuclear Association. 1 November 2013. Retrieved 8 September 2021.
- ^ a b "Russia completes key equipment for ITER". Nuclear Engineering International. 22 March 2021. Retrieved 14 September 2021.
- ^ "L&T builds key cryostat for world's largest nuclear fusion reactor". Uttar Pradesh, India: Financial Express. 30 June 2020. Retrieved 21 May 2021.
- ^ "INOXCVA Completes Manufacturing of Group-Y Cryolines & Group-W Warmlines for ITER Project - Asia Pacific | Energetica India Magazine". 31 July 2021.
- ^ "INOX India bags contract for Thermo-nuclear Fusion Reactor".
- ^ "Hyundai to build ITER vessel". Nuclear Engineering International. 22 January 2010. Retrieved 15 September 2021.
- ^ "More delays for ITER". Nuclear Engineering International. 12 January 2023. Retrieved 17 January 2023.
- ^ "Mixed reactions to ITER". Euractiv. Brussels, Belgium. 1 July 2005. Retrieved 2 April 2021.
- ^ Lerner, Eric J.; Hassan, Syed M.; Karamitsos-Zivkovič, Ivana; Fritsch, Rudolph (December 2023). "What are the fastest routes to fusion energy?". Physics of Plasmas. 30 (120602). Bibcode:2023PhPl...30l0602L. doi:10.1063/5.0170216. Retrieved 6 March 2024.
- ^ Jassby, Daniel (14 February 2018). "ITER is a showcase… for the drawbacks of fusion energy". Bulletin of the Atomic Scientists. Chicago, IL, US. Retrieved 2 April 2021.
- ^ Innovation is Key from ITER to DEMO. Dec 2013 Porkolab. MIT
- ^ Abdou, Mohamed (2021). "Physics and technology considerations for the deuterium–tritium fuel cycle and conditions for tritium fuel self sufficiency". Nuclear Fusion. 61 (1). Vienna, Austria: IAEA: 013001. Bibcode:2021NucFu..61a3001A. doi:10.1088/1741-4326/abbf35. S2CID 229444533. Retrieved 13 October 2021.
- ^ "Advantages of fusion". ITER. Retrieved 19 October 2016.
- ^ a b ITER website. Iter.org. Retrieved 21 May 2013.
- ^ Facts and Stats... 1/3 of fuel rods changed every 18 months. STPNOC.com.
- ^ "Detritiation Systems at ITER" (PDF). French Nuclear Safety Authority. 2010. Archived from the original (PDF) on 13 September 2014. Retrieved 12 August 2014.
- ^ "Advantages of fusion". ITER. Retrieved 11 February 2022.
- ^ Hiwatari, R.; Okano, K.; Asaoka, Y.; Shinya, K.; Ogawa, Y. (2005). "Demonstration tokamak fusion power station for early realization of net electric power generation". Nuclear Fusion. 45 (2): 96. Bibcode:2005NucFu..45...96H. doi:10.1088/0029-5515/45/2/004. S2CID 119594462.
- ^ DOE/EIA-0623 Challenges of Electric Power Industry Restructuring for Fuel Suppliers. Eia.doe.gov (September 1998). Retrieved 21 May 2013.
- ^ "Worldwide power – Electric Perspectives – Find Articles at BNET". 6 March 2009. Archived from the original on 6 March 2009. Retrieved 12 September 2018.
- ^ "Study on the impact of the ITER activities in the EU". Trinomics. Rotterdam, Netherlands. Retrieved 2 April 2021.
- ^ "GLOBAL TRENDS IN SUSTAINABLE ENERGY INVESTMENT 2008" (PDF). Archived from the original (PDF) on 21 July 2011. Retrieved 10 October 2010.
- ^ Nuclear Data for Helium Production in Fusion Archived 3 July 2007 at the Wayback Machine. (PDF). Retrieved 21 May 2013.
- ^ "Fusion Science and Technology Definitions – Burning Plasma". Plasma Science and Fusion Center. Retrieved 4 April 2021.
- ^ Kelly, Éanna (18 May 2018). "ITER Chief: I won't live to see benefits of fusion, but I will help us get there". Science Business. Brussels, Belgium. Retrieved 2 April 2021.
- ^ Commentaries on criticisms of magnetic fusion, Weston M. Stacey, Georgia Institute of Technology, March 1999
- ^ Khan, Aneeqa (1 March 2021). "Nuclear fusion: building a star on Earth is hard, which is why we need better materials". The Conversation. Melbourne, Australia. Retrieved 2 April 2021.
- ^ "Demonstration Fusion Reactors". Fusion for Energy. European Joint Undertaking for ITER and the Development of Fusion Energy. Archived from the original on 8 July 2007. Retrieved 17 November 2008.
- ^ "EFDA-JET". EFDA. 2009. Archived from the original on 23 July 2009. Retrieved 29 May 2009.
- ^ "Tore Supra". CEA. Archived from the original on 15 November 2012.
- ^ "MAST". Mega Ampere Spherical Tokamak. 2010. Archived from the original on 13 February 2010. Retrieved 1 February 2010.
- ^ "National Ignition Facility & Photon Science". Lawrence Livermore National Laboratory. Retrieved 29 May 2009.
- ^ Srinivasan, R. (2015). "Progress on design of SST-2 fusion reactor". Proceedings of the Thirtieth National Symposium on Plasma Science and Technology: Book of Abstracts.
- ^ "Physics meeting" (PDF). www-naweb.iaea.org. Archived from the original (PDF) on 30 March 2019. Retrieved 17 August 2015.
- ^ Zheng, Jinxing (2013). "Concept design of CFETR superconducting magnet system based on different maintenance ports". Fusion Engineering and Design. 88 (11): 2960–2966. Bibcode:2013FusED..88.2960Z. doi:10.1016/j.fusengdes.2013.06.008.
- ^ Song, Y. T.; Wu, S. T.; Li, J. G.; Wan, B. N.; Wan, Y. X.; Fu, P.; Ye, M. Y.; Zheng, J. X.; Lu, K.; Gao, X.; Liu, S. M.; Liu, X. F.; Lei, M. Z.; Peng, X. B.; Chen, Y. (1 March 2014). "Concept Design of CFETR Tokamak Machine". IEEE Transactions on Plasma Science. 42 (3): 503–509. Bibcode:2014ITPS...42..503S. doi:10.1109/TPS.2014.2299277. S2CID 24159256.
- ^ "Meeting info" (PDF). aries.ucsd.edu. Archived from the original (PDF) on 25 November 2015. Retrieved 17 August 2015.
- ^ "Beyond ITER". iter.org. Archived from the original on 20 May 2009.
- ^ Carayannis, Elias G.; Draper, John; Bhaneja, Balwant (2 October 2020). "Towards Fusion Energy in the Industry 5.0 and Society 5.0 Context: Call for a Global Commission for Urgent Action on Fusion Energy". Journal of the Knowledge Economy. 12 (4): 1891–1904. doi:10.1007/s13132-020-00695-5. ISSN 1868-7873. PMC 7529587.
- ^ "Demonstration fusion plants". www.iaea.org. 6 May 2021. Retrieved 28 May 2021.
- ^ "Wendelstein 7-X". Max-Planck-Institut für Plasmaphysik. 3 April 2009. Archived from the original on 21 May 2009. Retrieved 29 May 2009.
Further reading
[edit]Claessens, Michel. (2020). ITER: The giant fusion reactor: Bringing a Sun to Earth. Springer.
Clery, Daniel. (2013). A Piece of the Sun. Gerald Duckworth & Co. Ltd.
ITER. (2018). ITER Research Plan within the Staged Approach (Level III – Provisional Version). ITER.
Wendell Horton Jr, C., and Sadruddin Benkadda. (2015). ITER physics. World Scientific.
External links
[edit]- Official website
- ITER China website
- ITER EU (Fusion for Energy) website
- ITER India website Archived 16 April 2021 at the Wayback Machine
- ITER Japan website
- ITER Korea website
- ITER Russia website
- ITER US website
- The New Yorker, 3 March 2014, Star in a Bottle, by Raffi Khatchadourian
- Archival material collected by Prof. McCray relating to ITER's early phase (1979–1989) can be consulted at the Historical Archives of the European Union in Florence
- "ITER Talks (1): Introduction to ITER" video (53:00) at YouTube, by ITER Organization, July 23, 2021.
- The roles of the Host and the non-Host for the ITER Project. June 2005 The broader approach agreement with Japan.
- Fusion Electricity – A roadmap to the realisation of fusion energy Archived 30 May 2017 at the Wayback Machine EFDA 2012 – 8 missions, ITER, project plan with dependencies, ...